PROJECTS

TEHRAN AFRA has been operating since June 1999 as a contractor to international companies in the South Pars Gas Field Development Projects and has to date mobilized a work force in excess of 800 personnel consisting of permanent, contractual and project-based employees

TEHRAN AFRA to date have constructed, manufactured, delivered and installed more than 800,000 sqm of turnkey senior management and management camps for Expatriates including French, Italian, Korean, Chinese and TCN as well as Iranian nationals, comprising of kitchen, dining hall, stores, laundry, recreation facilities with swimming pool and sports facilities and office blocks. Tehran Afra uses various materials for its building works, ranging from prefabricated modular sandwich panel systems with life spans from 3 to 20 years to permanent structures made of block/brick-work or reinforced concrete.

Further works included the construction of permanent structures in the gas plant areas including reinforced concrete foundations, flood drainage systems and architecture buildings.

In carrying out the above-mentioned works Tehran Afra mobilized to a savannah site providing its own fully functioning construction camp. Tehran Afra construction camps include the provision of fire rated, thermally insulated and air-conditioned accommodation buildings, kitchen and dining facilities, ablution facilities, power generation, waste water containment facilities, water purification facilities, water heating facilities and medical clinic.

As a result of Tehran Afra’s performance in the field, the company has been awarded the prestigious “Contractor of the Year Award” on several occasions.

Following is a list of major contracts undertaken by Tehran Afra since its formation in 1999.

Sohrab Oil Field Development Project

Engineering, Procurement & Construction (EPC) of Camp, Warehouse & Laydown Area

Client: Dana Petro Sohrab Company (P.J.S.)

Date Started: 01-October-2023

Occupancy: 200-persons

Contract Service period: 16 months

Status: ONGOING

Petro-Sazeh Mobin Andimeshk Ebne Sina Petrochemical

Engineering, Procurement & Construction (EPC) of Site Offices and Related Facilities & Utilities

Client: Petro Sazeh Mobin Company

Year of completion: March-2024

Occupancy: 150-persons

Total occupied land area: 15,000 m2

Contract period: 8 months

Yadavaran Oil Field Development Project

Provision of Services including Catering, Housekeeping, Laundry, Transport & Camp Management for Sinopec Permanent & Pioneer Camps

Client: Sinopec International Petroleum E&P Corporation

Year of completion: April-2023

Occupancy: 200-persons

Contract Service period: 24 months

Dehloran Petrochemical Complex Project

EPC for Pioneer Camp including Accommodation, Office, Restaurant, Clinic, Fire Fighting, etc. and Associated Facilities

Client: Oil & Energy Industries Development Company (OIEC)

Year of completion: January-2023

Occupancy: 150-persons

Total occupied land area: 50,000 m2

Construction period: 6 months

Varavi Gas Compressor Station Project

EPC for Pioneer Camp and Associated Facilities

Client: Persia/Arman Paravar

Year of completion: December-2021

Occupancy: 120-persons

Total occupied land area: 22,000 m2

Construction period: 4 months

Sepher-Jufair Oilfield Development Project

EPC for Pioneer Camp & Yard and Associated Facilities

Client: Pasargad Exploration, Development & Production Co.

Year of completion: October-2021

Occupancy: 100-persons

Total occupied area: 14,000 m2

Construction period: 7 months

EPC for Adora Teb Pharmaceutical Warehouse and Office Building

Ahwaz Industrial Complex 3, Khuzestan Province

Client: ADORA TEB Company

Year of completion: February-2021

Total occupied area: 1,500 m2

Construction period: 11 months

Abadan Refinery Upgrading Project

EPC for Residential Buildings and Restaurant-Kitchen Building

Client: Consortium of SEI & ODCC

Year of completion: December-2019

Occupancy: 200-persons

Total occupied area: 4100 m2

Construction period: 6-months

North Yaran Oilfield Development Project

Expansion of PERSIA Company Pioneer Camp

Client: PERSIA Oil and Gas Industry Development Co.

Year of completion: June-2016

Occupancy: 100-persons

Total occupied area: 700 m2

Construction period> 45-days

North Azadegan Oil Field Development Project

Construction of Chemical Storage Shelters

Client: CNPC International Ltd. (IRAN)

Year of completion: July-2016

Total occupied area: 3,500 m2

Construction period: 90-days

North Azadegan Oil Field Development Project

Construction of Gathering Hall

Client: CNPC International Ltd. (IRAN)

Year of completion: February-2016

Capacity (seats): 300-persons

Total occupied area: 1,500 m2

Construction period: 70-days

North Azadegan Oil Field Development Project

Construction of Production Camp & Associated Facilities

Client: CNPC International Ltd. (IRAN)

Year of completion: June-2016

Occupancy: 200-persons

Total occupied area: 8,000 m2

Construction period: 7 months

North Azadegan Oil Field Development Project

Expansion of Operations Camp & Associated Facilities

Client: CNPC International Ltd. (IRAN)

Year of completion: January-2015

Occupancy: 120-persons

Total occupied area: 6,000 m2

Construction period   6 months

North Azadegan Oil Field Development Project

Additional Warehouse & Workshop-Laboratory in Pipe Yard Area

Client: CNPC International Ltd. (IRAN)

Year of completion: September-2015

Total occupied area: 3,000 m2

Construction period: 6 months

North Azadegan Oil Field Development Project

Construction of Operations Camp & Associated Facilities

Client: CNPC International Ltd. (IRAN)

Year of completion: July-2012

Occupancy: 150-persons

Total occupied area: 14,000 m2

Construction period: 7 months

North Azadegan Oil Field Development Project

Warehouse Pre-Construction – Provision of Sun Roof and Portable Units

Client: CNPC International Ltd. (IRAN)

Year of award May 2011

Occupancy      50-persons

Total occupied area    2,000 m2

Construction period   2 months

North Azadegan Oil Field Development Project

Provision Earthworks for CPF Area – Package B

Client: CNPC International Ltd. (IRAN)

Year of completion     July-2011

Total area       90,000 m2

Construction period   4 months

North Azadegan Oil Field Development Project

Supply, Installation, Maintenance and Services for Pioneer Camps and Associated Facilities

Client: CNPC International Ltd. (IRAN)

Year of completion     December-2012

Occupancy      50-persons

Total occupied area    1,000 m2

Construction period   2 months

Service Period 34 months

Yadavaran Oil Field Development Project

Provision of Services including Catering, Housekeeping, Laundry, Transport & Camp Management for Sinopec Permanent & Pioneer Camps

Client: Sinopec International Petroleum E&P Corporation

Date Started   01-May-2021

Occupancy      200-persons

Contract Service period          24 months

Yadavaran Oil Field Development Project

Supply & Installation of Portable Cabin Units in Well Pad Areas

Client: Sinopec International Petroleum E&P Corporation

Year of completion     January 2017

No. of Portable Open-Plan Units        46-Units

No. of Portable Toilet Ablution Units 56-Units

Delivery period           45-days

Yadavaran Oil Field Development Project

Construction of Multifunctional Sports Complex and Associated Facilities

Client: Sinopec International Petroleum E&P Corporation

Year of completion     April-2013

Occupancy      250-persons

Total occupied area    1,500 m2

Construction period   4 months

Yadavaran Oil Field Development Project

Supply, Installation, Maintenance and Services for Pioneer Camps and Associated Facilities

Client: Sinopec International Petroleum E&P Corporation

Year of completion     March-2012

Occupancy      150-persons

Total occupied area    2,500 m2

Construction period   2 months

Service Period 24 months

South Azadegan Oil Field Development Project

Supply & Construction of Temporary Camps and Temporary Facilities

Client: Petroiran Development Company (PEDCO)

Year of completion     April-2008

Occupancy      400-persons (40-buildings)

Total building area     12,500 m2

Construction period   8 months

South Azadegan Oil Field Development Project

Supply & Construction of Employer and EPCM Contractor Site Offices & Facilities

Client: Petroiran Development Company (PEDCO)

Year of completion     April-2008

Occupancy      300-persons (5-buildings)

Total building area     3,500 m2

Construction period   6 months

South Azadegan Oil Field Development Project

Supply & Construction of Workshops and Material Warehouses

Client: Petroiran Development Company (PEDCO)

Year of completion     April-2008

Total building area     6,350 m2

Construction period   8 months

South Azadegan Oil Field Development Project

Supply, Installation & Commissioning of Power Generation & Distribution System

Client: Petroiran Development Company (PEDCO)

Year of completion     April-2008

Required power capacity       6,500 kVA

Required cabling length         ±30,000-meters

Construction period   8 months

South Azadegan Oil Field Development Project

Supply, Installation & Commissioning of Sewage Treatment Plant & Facilities

Client: Petroiran Development Company (PEDCO)

Year of completion     April-2008

Required sewage capacity      1,200-m3 per day

Construction period   8 months

South Azadegan Oil Field Development Project

Supply, Installation & Commissioning of Potable & Hot Water Storage & Distribution System

Client: Petroiran Development Company (PEDCO)

Year of completion     April-2008

Required storage capacity      1,200-m3 per day

Required pipe length  ±10,000-meters

Construction period   6 months

South Azadegan Oil Field Development Project

Supply, Installation & Commissioning of Residential Waste Incineration System

Client: Petroiran Development Company (PEDCO)

Year of completion     April-2008

Required incineration capacity          9,000-kgs per day

Construction period   10 months

South Pars Phases 19 – Construction of Camp No. 1 EXTENSION & Associated Facilities

Client: Petropars Iran (PPI)

Year of completion     January-2013

Occupancy      6,000-persons

Total occupied area    45,000 m2

Construction period   6 months

South Pars Phases 19 – Construction of Camp No. 1 & Associated Facilities

Client: Petropars Iran (PPI)

Year of completion     July-2012

Occupancy      5,000-persons

Total occupied area    35,000 m2

Construction period   6 months

South Pars Phases 19 – Construction of Site Offices & Laydown Area

Client: Petropars Iran (PPI)

Year of completion     April-2012

Occupancy      800-persons

Total occupied area    15,000 m2

Construction period   6 months

South Pars Phases 22-24 – Project Administration Offices

Client: PetroSina Aria Company)

Year of completion     October-2011

Occupancy      500-persons

Total occupied area    9,000 m2

Construction period   9 months (extended for additional works)

South Pars Phases 22-24 – Utilities & External Works for Camp Construction PHASE 1 & PHASE 4

Client: PetroSina Aria Company

Year of completion     May-2011

Occupancy      1,200-persons

Total occupied area    15,000 m2

Construction period   9 months (extended for additional works)

South Pars Phases 2 & 3 – Meg Reclaim Unit Civil Works –

Client: TOTAL Fina Elf

Year of completion     2005

Construction period   10 weeks

Design concrete volume         400 m3

South Pars Phases 9 & 10 – GS Foreigner Camp

Client: GS Eng. & Const. Co.

Year of completion     2005

Occupancy      21 buildings

Total building area     4,500 m2

Construction period   3 months

South Pars Phases 6-7-8 – TOYO Expatriate & Local Camp

Client; Consortium of TOYO, JGC & IDRO

Year of completion     2005

Occupancy      50 buildings

Total building area     14,500 m2

Construction period   4 months

South Pars Phases 4 & 5 – EIBV Additional Expatriate Staff Camp

Client: ENI Iran BV

Year of completion     2004

Occupancy      64 persons

Total building area     2,700 m2

Construction period   3 months

South Pars Phases 4 & 5 – Hyundai Site Camp & Facilities

Client: Hyundai Eng. & Const. Co.

Year of completion     2003

Occupancy      3,500 persons

Total building area     42,500 m2

Construction period   8 months

South Pars Phases 4 & 5 – Permanent Facilities for Civil Works

Client: Hyundai Eng. & Const. Co.

Year of completion     2003

Outfall drainage system         2,000 meters

Construction period   4 months

South Pars Phases 4 & 5 – Permanent Facilities for Civil Works

Client: Hyundai Eng. & Const. Co.

Year of completion     2003

Electrical & IT cable trench     1,500 meters

Construction period   4 months

South Pars Phases 4 & 5 – Hyundai Site Offices & Facilities

Client: Hyundai Eng. & Const. Co.

Year of completion     2003

Total building area     9,000 m2

Construction period   4 months

South Pars Phases 4 & 5 – ENI Iran BV Site Offices

Client: Hyundai Eng. & Const. Co.

Year of completion     2002

Total building area     1,550 m2

Construction period   45 days

South Pars Phases 2 & 3 – TOTAL Fina Elf Camp

Client: Hyundai Eng. & Const. Co.

Year of completion     2001

Occupancy      200 persons

Total building area     6,800 m2

Construction Period   6 months

South Pars Phases 2 & 3 – TOTAL/SPGC Camp

Client: Hyundai Eng. & Const. Co.

Year of completion     2001

Occupancy      150 persons

Total building area     2,500 m2

Construction Period   2 months

South Pars Phases 2 & 3 – TOTAL/SPGC Camp Additional Perimeter Security Fencing

Client: Hyundai Eng. & Const. Co.

Year of completion     2001

Total building area     1,200 LM

Construction Period   20 days

South Pars Phases 2 & 3 – Process Area Civil Works

Client: Hyundai Eng. & Const. Co.

Year of completion     2001

432 foundations

Design concrete volume 2,150 m3

Construction period   9 months

South Pars Phases 2 & 3 – Onshore Area Civil Works

Client: Hyundai Eng. & Const. Co.

Year of completion     2001

Flood drainage system

Design concrete volume 3,400 m3

Construction period   9 months

South Pars Phases 2 & 3 – Permanent Facilities for Architecture Works

Client: Hyundai Eng. & Const. Co.

Year of completion: 2001

Construction period: 8 months

82 Shelters

21,500 m2

South Pars Phases 2 & 3 – Local Camps       

Client: Hyundai Eng. & Const. Co.

Year of completion     2001

Occupancy      5,200 persons

Total building area     24,100 m2

Construction period   5 months

South Pars Phases 2 & 3 – Construction Site Electrics

Client: Hyundai Eng. & Const. Co.

Year of award 2000

Total area       28,702 m2

Construction period   3 months

South Pars Phases 2 & 3 – Hyundai Camp

Client: Hyundai Eng. & Const. Co.

Year of completion     2000

Occupancy      430 persons

Total building area     7,700 m2

Construction period   6 months

South Pars Phases 2 & 3 – TOTAL Fina Elf / Hyundai Site Offices

Client: Hyundai Eng. & Const. Co.

Year of completion     2000

Total building area     11,300 m2

Construction period   5 months

South Pars Phases 2 & 3 – Construction Area

Client: Hyundai Eng. & Const. Co.

Year of completion     2000

Total building area     28,700 m2

Construction period   3 months

South Pars Phases 2 & 3 – Waste Water Treatment Plant

Client: Hyundai Eng. & Const. Co.

Year of completion     2000

Total building area     4,800 m2

Construction period   2 months

South Pars Phases 2 & 3 –Desalination Pipeline

Client: Hyundai Eng. & Const. Co.

Year of completion     2000

Total pipe length        4,970 meters

Construction period   1 month

Darquain Oil Field – O.T.U Site

Client: Arvandan Co.

Construction of Multi-Function Hall for Arvandan Co.

Year of completion                 February-2010

Total building area                 400 m2

Construction period               45 days

Darquain Oil Field – Pipe Sleepers

Client: ENI Iran BV

Year of completion: 2004

Total quantity: 1,800 m2

Construction period: 45 days

Darquain Oil Field – Additional Warehouse & Storage

Client: ENI Iran BV

Year of completion: 2004

Total building area: 400 m2

Construction period: 45 days

Darquain Oil Field – Brine Plant Foundation

Client: ENI Iran BV

Year of completion: 2004

Total building area:480 m3

Construction period: 30 days

Darquain Oil Field – Warehouse & Storage

Client: ENI Iran BV

Year of completion: 2003

Total building area: 400 m2

Construction period: 2 months

Darquain Oil Field – Site Offices & Facilities

Client: ENI Iran BV

Year of completion: 2003

Total building area: 2,000 m2

Construction period: 3 months

Special Projects

Permanent Architecture Buildings – South Pars Phases 4 & 5

Tehran Afra was contracted to construct permanent seismic reinforced buildings in the Plant Area of South Pars Phases 4 & 5 consisting of Medical Centers, Administration Building and Guard Houses.

Year of completion     2004

Construction period   6 months

Conference Centre – South Pars Phases 4 & 5

Tehran Afra was contracted to design, supply & construct a multi-function hall with the latest audio-video network and interpretation system.

Year of completion     2004

Construction period   35 days

Abadan Refinery – Abadan Province

A team of mechanical, electrical and instrumental engineers was contracted to repair, re-assemble and commission one 55 Mw gas turbine generators, overhaul and installation of a 5000ft3 /min flow centrifugal Clark Dressor compressor and to design and manufacture spare parts related to mechanical seals and centrifugal pumps. The project was completed within six months of contract award.

Salman Offshore Facility / N.I.O.C. – Hormusghan Province

Contracted to overhaul and install a turbo-compressor.

Pump Station 7. / N.I.O.C.  – Esfahan

Contracted to commission 4000-horse power Ingersoll-Rand turbo-pump

Lavan Refinery / N.I.O.C. – Lavan Island

Afra Turbine was contracted to install two 40Mw gas turbines, a Rostan Gas Turbine gas fuel system and to manufacture two high-pressure fuel pumps.