TEHRAN AFRA has been operating since June 1999 as a contractor to international companies in the South Pars Gas Field Development Projects and has to date mobilized a work force in excess of 800 personnel consisting of permanent, contractual and project-based employees
TEHRAN AFRA to date have constructed, manufactured, delivered and installed more than 800,000 sqm of turnkey senior management and management camps for Expatriates including French, Italian, Korean, Chinese and TCN as well as Iranian nationals, comprising of kitchen, dining hall, stores, laundry, recreation facilities with swimming pool and sports facilities and office blocks. Tehran Afra uses various materials for its building works, ranging from prefabricated modular sandwich panel systems with life spans from 3 to 20 years to permanent structures made of block/brick-work or reinforced concrete.
Further works included the construction of permanent structures in the gas plant areas including reinforced concrete foundations, flood drainage systems and architecture buildings.
In carrying out the above-mentioned works Tehran Afra mobilized to a savannah site providing its own fully functioning construction camp. Tehran Afra construction camps include the provision of fire rated, thermally insulated and air-conditioned accommodation buildings, kitchen and dining facilities, ablution facilities, power generation, waste water containment facilities, water purification facilities, water heating facilities and medical clinic.
As a result of Tehran Afra’s performance in the field, the company has been awarded the prestigious “Contractor of the Year Award” on several occasions.
Following is a list of major contracts undertaken by Tehran Afra since its formation in 1999.
Sohrab Oil Field Development Project
Engineering, Procurement & Construction (EPC) of Camp, Warehouse & Laydown Area
Client: Dana Petro Sohrab Company (P.J.S.)
Date Started: 01-October-2023
Occupancy: 200-persons
Contract Service period: 16 months
Status: ONGOING
Petro-Sazeh Mobin Andimeshk Ebne Sina Petrochemical
Engineering, Procurement & Construction (EPC) of Site Offices and Related Facilities & Utilities
Client: Petro Sazeh Mobin Company
Year of completion: March-2024
Occupancy: 150-persons
Total occupied land area: 15,000 m2
Contract period: 8 months
Yadavaran Oil Field Development Project
Client: Sinopec International Petroleum E&P Corporation
Year of completion: April-2023
Occupancy: 200-persons
Contract Service period: 24 months
Dehloran Petrochemical Complex Project
Client: Oil & Energy Industries Development Company (OIEC)
Year of completion: January-2023
Occupancy: 150-persons
Total occupied land area: 50,000 m2
Construction period: 6 months
Varavi Gas Compressor Station Project
EPC for Pioneer Camp and Associated Facilities
Client: Persia/Arman Paravar
Year of completion: December-2021
Occupancy: 120-persons
Total occupied land area: 22,000 m2
Construction period: 4 months
Sepher-Jufair Oilfield Development Project
EPC for Pioneer Camp & Yard and Associated Facilities
Client: Pasargad Exploration, Development & Production Co.
Year of completion: October-2021
Occupancy: 100-persons
Total occupied area: 14,000 m2
Construction period: 7 months
EPC for Adora Teb Pharmaceutical Warehouse and Office Building
Ahwaz Industrial Complex 3, Khuzestan Province
Client: ADORA TEB Company
Year of completion: February-2021
Total occupied area: 1,500 m2
Construction period: 11 months
Abadan Refinery Upgrading Project
EPC for Residential Buildings and Restaurant-Kitchen Building
Client: Consortium of SEI & ODCC
Year of completion: December-2019
Occupancy: 200-persons
Total occupied area: 4100 m2
Construction period: 6-months
North Yaran Oilfield Development Project
Expansion of PERSIA Company Pioneer Camp
Client: PERSIA Oil and Gas Industry Development Co.
Year of completion: June-2016
Occupancy: 100-persons
Total occupied area: 700 m2
Construction period> 45-days
North Azadegan Oil Field Development Project
Construction of Chemical Storage Shelters
Client: CNPC International Ltd. (IRAN)
Year of completion: July-2016
Total occupied area: 3,500 m2
Construction period: 90-days
North Azadegan Oil Field Development Project
Construction of Gathering Hall
Client: CNPC International Ltd. (IRAN)
Year of completion: February-2016
Capacity (seats): 300-persons
Total occupied area: 1,500 m2
Construction period: 70-days
North Azadegan Oil Field Development Project
Construction of Production Camp & Associated Facilities
Client: CNPC International Ltd. (IRAN)
Year of completion: June-2016
Occupancy: 200-persons
Total occupied area: 8,000 m2
Construction period: 7 months
North Azadegan Oil Field Development Project
Expansion of Operations Camp & Associated Facilities
Client: CNPC International Ltd. (IRAN)
Year of completion: January-2015
Occupancy: 120-persons
Total occupied area: 6,000 m2
Construction period 6 months
North Azadegan Oil Field Development Project
Additional Warehouse & Workshop-Laboratory in Pipe Yard Area
Client: CNPC International Ltd. (IRAN)
Year of completion: September-2015
Total occupied area: 3,000 m2
Construction period: 6 months
North Azadegan Oil Field Development Project
Construction of Operations Camp & Associated Facilities
Client: CNPC International Ltd. (IRAN)
Year of completion: July-2012
Occupancy: 150-persons
Total occupied area: 14,000 m2
Construction period: 7 months
North Azadegan Oil Field Development Project
Warehouse Pre-Construction – Provision of Sun Roof and Portable Units
Client: CNPC International Ltd. (IRAN)
Year of award May 2011
Occupancy 50-persons
Total occupied area 2,000 m2
Construction period 2 months
North Azadegan Oil Field Development Project
Provision Earthworks for CPF Area – Package B
Client: CNPC International Ltd. (IRAN)
Year of completion July-2011
Total area 90,000 m2
Construction period 4 months
North Azadegan Oil Field Development Project
Supply, Installation, Maintenance and Services for Pioneer Camps and Associated Facilities
Client: CNPC International Ltd. (IRAN)
Year of completion December-2012
Occupancy 50-persons
Total occupied area 1,000 m2
Construction period 2 months
Service Period 34 months
Yadavaran Oil Field Development Project
Client: Sinopec International Petroleum E&P Corporation
Date Started 01-May-2021
Occupancy 200-persons
Contract Service period 24 months
Yadavaran Oil Field Development Project
Supply & Installation of Portable Cabin Units in Well Pad Areas
Client: Sinopec International Petroleum E&P Corporation
Year of completion January 2017
No. of Portable Open-Plan Units 46-Units
No. of Portable Toilet Ablution Units 56-Units
Delivery period 45-days
Yadavaran Oil Field Development Project
Construction of Multifunctional Sports Complex and Associated Facilities
Client: Sinopec International Petroleum E&P Corporation
Year of completion April-2013
Occupancy 250-persons
Total occupied area 1,500 m2
Construction period 4 months
Yadavaran Oil Field Development Project
Supply, Installation, Maintenance and Services for Pioneer Camps and Associated Facilities
Client: Sinopec International Petroleum E&P Corporation
Year of completion March-2012
Occupancy 150-persons
Total occupied area 2,500 m2
Construction period 2 months
Service Period 24 months
South Azadegan Oil Field Development Project
Supply & Construction of Temporary Camps and Temporary Facilities
Client: Petroiran Development Company (PEDCO)
Year of completion April-2008
Occupancy 400-persons (40-buildings)
Total building area 12,500 m2
Construction period 8 months
South Azadegan Oil Field Development Project
Supply & Construction of Employer and EPCM Contractor Site Offices & Facilities
Client: Petroiran Development Company (PEDCO)
Year of completion April-2008
Occupancy 300-persons (5-buildings)
Total building area 3,500 m2
Construction period 6 months
South Azadegan Oil Field Development Project
Supply & Construction of Workshops and Material Warehouses
Client: Petroiran Development Company (PEDCO)
Year of completion April-2008
Total building area 6,350 m2
Construction period 8 months
South Azadegan Oil Field Development Project
Supply, Installation & Commissioning of Power Generation & Distribution System
Client: Petroiran Development Company (PEDCO)
Year of completion April-2008
Required power capacity 6,500 kVA
Required cabling length ±30,000-meters
Construction period 8 months
South Azadegan Oil Field Development Project
Supply, Installation & Commissioning of Sewage Treatment Plant & Facilities
Client: Petroiran Development Company (PEDCO)
Year of completion April-2008
Required sewage capacity 1,200-m3 per day
Construction period 8 months
South Azadegan Oil Field Development Project
Supply, Installation & Commissioning of Potable & Hot Water Storage & Distribution System
Client: Petroiran Development Company (PEDCO)
Year of completion April-2008
Required storage capacity 1,200-m3 per day
Required pipe length ±10,000-meters
Construction period 6 months
South Azadegan Oil Field Development Project
Supply, Installation & Commissioning of Residential Waste Incineration System
Client: Petroiran Development Company (PEDCO)
Year of completion April-2008
Required incineration capacity 9,000-kgs per day
Construction period 10 months
South Pars Phases 19 – Construction of Camp No. 1 EXTENSION & Associated Facilities
Client: Petropars Iran (PPI)
Year of completion January-2013
Occupancy 6,000-persons
Total occupied area 45,000 m2
Construction period 6 months
South Pars Phases 19 – Construction of Camp No. 1 & Associated Facilities
Client: Petropars Iran (PPI)
Year of completion July-2012
Occupancy 5,000-persons
Total occupied area 35,000 m2
Construction period 6 months
South Pars Phases 19 – Construction of Site Offices & Laydown Area
Client: Petropars Iran (PPI)
Year of completion April-2012
Occupancy 800-persons
Total occupied area 15,000 m2
Construction period 6 months
South Pars Phases 22-24 – Project Administration Offices
Client: PetroSina Aria Company)
Year of completion October-2011
Occupancy 500-persons
Total occupied area 9,000 m2
Construction period 9 months (extended for additional works)
South Pars Phases 22-24 – Utilities & External Works for Camp Construction PHASE 1 & PHASE 4
Client: PetroSina Aria Company
Year of completion May-2011
Occupancy 1,200-persons
Total occupied area 15,000 m2
Construction period 9 months (extended for additional works)
South Pars Phases 2 & 3 – Meg Reclaim Unit Civil Works –
Client: TOTAL Fina Elf
Year of completion 2005
Construction period 10 weeks
Design concrete volume 400 m3
South Pars Phases 9 & 10 – GS Foreigner Camp
Client: GS Eng. & Const. Co.
Year of completion 2005
Occupancy 21 buildings
Total building area 4,500 m2
Construction period 3 months
South Pars Phases 6-7-8 – TOYO Expatriate & Local Camp
Client; Consortium of TOYO, JGC & IDRO
Year of completion 2005
Occupancy 50 buildings
Total building area 14,500 m2
Construction period 4 months
South Pars Phases 4 & 5 – EIBV Additional Expatriate Staff Camp
Client: ENI Iran BV
Year of completion 2004
Occupancy 64 persons
Total building area 2,700 m2
Construction period 3 months
South Pars Phases 4 & 5 – Hyundai Site Camp & Facilities
Client: Hyundai Eng. & Const. Co.
Year of completion 2003
Occupancy 3,500 persons
Total building area 42,500 m2
Construction period 8 months
South Pars Phases 4 & 5 – Permanent Facilities for Civil Works
Client: Hyundai Eng. & Const. Co.
Year of completion 2003
Outfall drainage system 2,000 meters
Construction period 4 months
South Pars Phases 4 & 5 – Permanent Facilities for Civil Works
Client: Hyundai Eng. & Const. Co.
Year of completion 2003
Electrical & IT cable trench 1,500 meters
Construction period 4 months
South Pars Phases 4 & 5 – Hyundai Site Offices & Facilities
Client: Hyundai Eng. & Const. Co.
Year of completion 2003
Total building area 9,000 m2
Construction period 4 months
South Pars Phases 4 & 5 – ENI Iran BV Site Offices
Client: Hyundai Eng. & Const. Co.
Year of completion 2002
Total building area 1,550 m2
Construction period 45 days
South Pars Phases 2 & 3 – TOTAL Fina Elf Camp
Client: Hyundai Eng. & Const. Co.
Year of completion 2001
Occupancy 200 persons
Total building area 6,800 m2
Construction Period 6 months
South Pars Phases 2 & 3 – TOTAL/SPGC Camp
Client: Hyundai Eng. & Const. Co.
Year of completion 2001
Occupancy 150 persons
Total building area 2,500 m2
Construction Period 2 months
South Pars Phases 2 & 3 – TOTAL/SPGC Camp Additional Perimeter Security Fencing
Client: Hyundai Eng. & Const. Co.
Year of completion 2001
Total building area 1,200 LM
Construction Period 20 days
South Pars Phases 2 & 3 – Process Area Civil Works
Client: Hyundai Eng. & Const. Co.
Year of completion 2001
432 foundations
Design concrete volume 2,150 m3
Construction period 9 months
South Pars Phases 2 & 3 – Onshore Area Civil Works
Client: Hyundai Eng. & Const. Co.
Year of completion 2001
Flood drainage system
Design concrete volume 3,400 m3
Construction period 9 months
South Pars Phases 2 & 3 – Permanent Facilities for Architecture Works
Client: Hyundai Eng. & Const. Co.
Year of completion: 2001
Construction period: 8 months
82 Shelters
21,500 m2
South Pars Phases 2 & 3 – Local Camps
Client: Hyundai Eng. & Const. Co.
Year of completion 2001
Occupancy 5,200 persons
Total building area 24,100 m2
Construction period 5 months
South Pars Phases 2 & 3 – Construction Site Electrics
Client: Hyundai Eng. & Const. Co.
Year of award 2000
Total area 28,702 m2
Construction period 3 months
South Pars Phases 2 & 3 – Hyundai Camp
Client: Hyundai Eng. & Const. Co.
Year of completion 2000
Occupancy 430 persons
Total building area 7,700 m2
Construction period 6 months
South Pars Phases 2 & 3 – TOTAL Fina Elf / Hyundai Site Offices
Client: Hyundai Eng. & Const. Co.
Year of completion 2000
Total building area 11,300 m2
Construction period 5 months
South Pars Phases 2 & 3 – Construction Area
Client: Hyundai Eng. & Const. Co.
Year of completion 2000
Total building area 28,700 m2
Construction period 3 months
South Pars Phases 2 & 3 – Waste Water Treatment Plant
Client: Hyundai Eng. & Const. Co.
Year of completion 2000
Total building area 4,800 m2
Construction period 2 months
South Pars Phases 2 & 3 –Desalination Pipeline
Client: Hyundai Eng. & Const. Co.
Year of completion 2000
Total pipe length 4,970 meters
Construction period 1 month
Darquain Oil Field – O.T.U Site
Client: Arvandan Co.
Construction of Multi-Function Hall for Arvandan Co.
Year of completion February-2010
Total building area 400 m2
Construction period 45 days
Darquain Oil Field – Pipe Sleepers
Client: ENI Iran BV
Year of completion: 2004
Total quantity: 1,800 m2
Construction period: 45 days
Darquain Oil Field – Additional Warehouse & Storage
Client: ENI Iran BV
Year of completion: 2004
Total building area: 400 m2
Construction period: 45 days
Darquain Oil Field – Brine Plant Foundation
Client: ENI Iran BV
Year of completion: 2004
Total building area:480 m3
Construction period: 30 days
Darquain Oil Field – Warehouse & Storage
Client: ENI Iran BV
Year of completion: 2003
Total building area: 400 m2
Construction period: 2 months
Darquain Oil Field – Site Offices & Facilities
Client: ENI Iran BV
Year of completion: 2003
Total building area: 2,000 m2
Construction period: 3 months
Permanent Architecture Buildings – South Pars Phases 4 & 5
Tehran Afra was contracted to construct permanent seismic reinforced buildings in the Plant Area of South Pars Phases 4 & 5 consisting of Medical Centers, Administration Building and Guard Houses.
Year of completion 2004
Construction period 6 months
Conference Centre – South Pars Phases 4 & 5
Tehran Afra was contracted to design, supply & construct a multi-function hall with the latest audio-video network and interpretation system.
Year of completion 2004
Construction period 35 days
Abadan Refinery – Abadan Province
A team of mechanical, electrical and instrumental engineers was contracted to repair, re-assemble and commission one 55 Mw gas turbine generators, overhaul and installation of a 5000ft3 /min flow centrifugal Clark Dressor compressor and to design and manufacture spare parts related to mechanical seals and centrifugal pumps. The project was completed within six months of contract award.
Salman Offshore Facility / N.I.O.C. – Hormusghan Province
Contracted to overhaul and install a turbo-compressor.
Pump Station 7. / N.I.O.C. – Esfahan
Contracted to commission 4000-horse power Ingersoll-Rand turbo-pump
Lavan Refinery / N.I.O.C. – Lavan Island
Afra Turbine was contracted to install two 40Mw gas turbines, a Rostan Gas Turbine gas fuel system and to manufacture two high-pressure fuel pumps.